Purchase Reports
Browse and purchase individual analysis reports from the interconnection.fyi team.
2026 Half-Year Report
$995Analysis of the U.S. interconnection queue through the first half of 2026: 245 GW in withdrawals, PJM's legacy queue reset, an accelerating gas buildout, and 48 GW of new capacity with no published technology. Includes downloadable datasets.
SPP DISIS-2024-001 Phase 1 Cost Report
$995Analysis of SPP's DISIS-2024-001 Phase 1 study results — the largest interconnection cluster in SPP history with 251 active projects and 66.5 GW of capacity. Contextualizes cost assignments against historical trends, identifies constraints and bottlenecks, and projects attrition scenarios.
2025 Annual Report
$995Comprehensive analysis of the 2025 U.S. interconnection queue landscape — 733 GW in withdrawals, technology shifts, queue timelines, and the impact of FERC Order 2023 and OBBBA on the generation pipeline. Includes downloadable datasets.