GridTracker

Purchase Reports

Browse and purchase individual analysis reports from the interconnection.fyi team.

2026 Half-Year Report

$995

Analysis of the U.S. interconnection queue through the first half of 2026: 245 GW in withdrawals, PJM's legacy queue reset, an accelerating gas buildout, and 48 GW of new capacity with no published technology. Includes downloadable datasets.

Half-Year Retrospective
Withdrawals
Queue Reform
OBBBA
Technology Trends
Data Center Demand

SPP DISIS-2024-001 Phase 1 Cost Report

$995

Analysis of SPP's DISIS-2024-001 Phase 1 study results — the largest interconnection cluster in SPP history with 251 active projects and 66.5 GW of capacity. Contextualizes cost assignments against historical trends, identifies constraints and bottlenecks, and projects attrition scenarios.

SPP
DISIS-2024-001
Phase 1
Cost Analysis
Network Upgrades

2025 Annual Report

$995

Comprehensive analysis of the 2025 U.S. interconnection queue landscape — 733 GW in withdrawals, technology shifts, queue timelines, and the impact of FERC Order 2023 and OBBBA on the generation pipeline. Includes downloadable datasets.

Annual Retrospective
Withdrawals
Queue Reform
FERC Order 2023
Technology Trends
Data Center Demand